Sync Project Tasks to Outlook, without Exchange
One of the great new features in Project Professional 2010 was the ability to synchronise a Project schedule with a SharePoint task list. Through this capability and a SharePoint 2010 environment, simple team level project statusing can be achieved with ease.
In every demonstration I have seen, and in fact given, I have always assumed that the person updating the tasks would log into SharePoint and update the task through the web interface.
Posts
Sync to SharePoint Screencast
In a departure from the usual content on this blog, I thought I would try something a bit different, a screen cast. To start of, I have picked one of my favourite features of Project 2010, Sync to SharePoint, a fantastic little feature that allows you project schedule to be synchronised directly with a SharePoint Foundation team site list.
[vimeo http://vimeo.com/8944252]
This screen cast is very much a toe in the water , so if you like them, please let me know and I will do some more.